Expansion and Safety Projects

Expansion and Safety Projects

Road expansion (new road construction or added travel lanes) and safety projects require the preparation of detailed design plans.  These projects are more expensive than road maintenance and surface treatment projects and often require the County to leverage State or federal funding to offset the design and/or construction costs.  When federal funding is utilized, the project development process takes much more time due to the additional requirements and approvals that must be met with the expenditure of federal funding.  The list below highlights the road expansion and safety projects that are already in or will soon be in the project development process.

CR 100 S/ CR 400 E Roundabout

 

Project Description

Construction of a single lane roundabout at the intersection of CR 400 E and CR 100 S

 

Current Status

Design

 

Anticipated Construction

2026/2027

 

Funding

HSIP Federal

90% Federal / 10% Local

 

 

Countywide Sign Replacement

 

Project Description

Replacement of Regulatory and Warning Signs

 

Current Status

Design

 

Anticipated Construction

2024

 

Funding

HSIP Federal

90% Federal / 10% Local

 

Countywide Striping on Arterials & Collectors

 

Project Description

Adding pavement markings where they do not currently exist on arterials and collectors

 

Current Status

Design

 

Anticipated Construction

2025/2026

 

Funding

HSIP Federal

90% Federal / 10% Local

 

 

 

 

 

 

 

 

 

Services & Resources

Our Office Hours

Mon-Fri  7am-3:30pm

Closed daily for lunch from 11am to 11:30 am

 

1955 Indianapolis Ave

Lebanon, IN 46052

 

Nick Parr

Director

 

Phone: 765-482-4550

Fax: 765-483-4451

[email protected]

Looking for Someone?

Visit our office directory.

Boone County Government. All Rights Reserved.