2018 Building Maintenance Projects
Courthouse
- repair to stained-glass dome
- interior marble repair & cleaning
- all lighting converted to LED
- replacement of HVAC chillers and boilers
- ADA ramp installed on the south side of the buliding
Annex
- repair & seal rear north-side parking lot
- replace carpeting in basement
Key Bank Building
- HVAC replacements and upgrades
- roof replacement
- elevator upgrades
- completion of LED lighting
- sealing of building envelope
Jail Building
- water softener replacement
- upgrade to 1st-floor flooring
- upgrades to cell-block door locks, hinges, and water dispensing devices
Highway Building
- partial roof replacement on main building
- repair and upgrade to salt barn