Building Maintenance

2018 Building Maintenance Projects



  • repair to stained-glass dome
  • interior marble repair & cleaning
  • all lighting converted to LED
  • replacement of HVAC chillers and boilers
  • ADA ramp installed on the south side of the buliding



  • repair & seal rear north-side parking lot
  • replace carpeting in basement


Key Bank Building

  • HVAC replacements and upgrades
  • roof replacement
  • elevator upgrades
  • completion of LED lighting
  • sealing of building envelope


Jail Building

  • water softener replacement
  • upgrade to 1st-floor flooring
  • upgrades to cell-block door locks, hinges, and water dispensing devices


Highway Building

  • partial roof replacement on main building
  • repair and upgrade to salt barn